Manufacturer Photo Gallery
<h6>1384 Housing Units And its Associated Infrastructure in DERNA City</h6><br><h7>Country: Libya / Client: ODAC<br>Company: Won Engineering & Construction<br>Project Cost: 233,545 in thousand US$ / Work Duration: 2007/08/15 ~ 2011/02/13</h7>
<h6>28 CCC Norte II CCPP Project</h6><br><h7>Country: Mexico / Client: KST Electric Power Company<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 275,245 in thousand US$ / Work Duration: 2011/01/08 ~ 2013/05/31</h7>
<h6>5,000 HOUSING UNIT PROJECT IN TRIPOLI</h6><br><h7>Country: Libya / Client: National Council for Real Estate Investment<br>Company: <a href='http://www.daewooenc.com/eng/' target='_blank'>Daewoo Engineering&Construction Co., Ltd.</a><br>Project Cost: 511,911 in thousand US$ / Work Duration: 1981/12/08 ~ 1997/02/28</h7>
<h6>6th Gas Separation Plant Project</h6><br><h7>Country: Thailand / Client: PTT Public Company Limited<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 634,488 in thousand US$ / Work Duration: 2007/09/07 ~ 2011/01/25</h7>
<h6>AIR BASE FACILITIES, TABUK</h6><br><h7>Country: Saudi Arabia / Client: MINISTRY OF DEFENCE & AVIATION<br>Company: <a href='http://www.hanjinsc.com/english/main.asp' target='_blank'>Hanjin Heavy Industries & Construction Co., Ltd.</a><br>Project Cost: 227,668 in thousand US$ / Work Duration: 1990/09/02 ~ 1994/10/31</h7>
<h6>AL-MUSSAIB THERMAL POWER STATION PROJ.</h6><br><h7>Country: Iraq / Client: STATE ORGANIZATION FOR ELECTRICITY<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 730,253 in thousand US$ / Work Duration: 1984/08/13 ~ 1988/02/12</h7>
<h6>ATC Reformer and Aromatics Complex II Project</h6><br><h7>Country: Thailand / Client: The Aromatics(Thailand) Public Co. Ltd.<br>Company: <a href='http://www.gsconst.co.kr/en/' target='_blank'>GS Engineering&Construction Corporation</a><br>Project Cost: 235,868 in thousand US$ / Work Duration: 2005/08/01 ~ 2009/01/16</h7>
<h6>Al Dur Independent Water and Power Project</h6><br><h7>Country: Bahrain / Client: Al Dur Power and Water Company BSC<br>Company: <a href='http://english.hhi.co.kr/main/' target='_blank'>Hyundai Heavy Industries Co., Ltd.</a><br>Project Cost: 1,741,500 in thousand US$ / Work Duration: 2008/08/14 ~ 2011/06/01</h7>
<h6>Al Waha PHD&PP Project Propane Dehydrogenation & Plypropylene Project</h6><br><h7>Country: Saudi Arabia / Client: Sahara Petrochemical Company<br>Company: <a href='http://eng.daelim.co.kr' target='_blank'>Daelim Industrial Co., Ltd.</a><br>Project Cost: 377,077 in thousand US$ / Work Duration: 2006/01/25 ~ 2008/11/08</h7>
<h6>Al-Shuweihat S2 IWPP</h6><br><h7>Country: United Arab Emirates / Client: Abu Dhabi Water and Electricity Authority<br>Company: <a href='http://www.doosanheavy.com/en/main.do' target='_blank'>Doosan Heavy Industries & Construction Co., Ltd.</a><br>Project Cost: 799,471 in thousand US$ / Work Duration: 2008/12/11 ~ 2011/10/18</h7>
<h6>Algeria Oman Fertilizer project</h6><br><h7>Country: Algeria / Client: Suhail Bahwan Group & Sonatrach<br>Company: <a href='http://www.daewooenc.com/eng/' target='_blank'>Daewoo Engineering&Construction Co., Ltd.</a><br>Project Cost: 670,696 in thousand US$ / Work Duration: 2008/10/01 ~ 2012/05/31</h7>
<h6>Architectural Design for a Combined Cycle Power Plant in Misurata & Benghazi, Libya</h6><br><h7>Country: Libya / Client: GENERAL ELECTRIC CO OF LIBYA<br>Company: <a href='http://www.daewooenc.com/eng/' target='_blank'>Daewoo Engineering&Construction Co., Ltd.</a><br>Project Cost: 541,740 in thousand US$ / Work Duration: 2007/07/30 ~ 2011/01/31</h7>
<h6>Asia Square Tower 2(46-Storey Commercial and Hotel Building at Marina View)</h6><br><h7>Country: Singapore / Client: Asia Square Tower 2 Pte. Ltd.<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 345,333 in thousand US$ / Work Duration: 2011/04/01 ~ 2013/08/31</h7>
<h6>BAGHDAD MEDICAL CITY PHASE 2B</h6><br><h7>Country: Iraq / Client: STATE ORGANIZATION FOR HOUSING<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 326,924 in thousand US$ / Work Duration: 1980/07/11 ~ 1984/01/25</h7>
<h6>BOSOWA CEMENT PLANT(1.8MTA) PROJECT</h6><br><h7>Country: Indonesia / Client: PT SEMEN BOSOWA MAROS<br>Company: <a href='http://www.daewooenc.com/eng/' target='_blank'>Daewoo Engineering&Construction Co., Ltd.</a><br>Project Cost: 208,800 in thousand US$ / Work Duration: 1996/06/30 ~ 1998/06/29</h7>
<h6>Barka 3 IPP Project</h6><br><h7>Country: Oman / Client: Al Suwadi Co. SAOC<br>Company: <a href='http://www.gsconst.co.kr/en/' target='_blank'>GS Engineering&Construction Corporation</a><br>Project Cost: 338,954 in thousand US$ / Work Duration: 2010/09/24 ~ 2013/04/01</h7>
<h6>Boubyan Seaport Project Phace 1, Stage 2 (Tender No.4/2008)</h6><br><h7>Country: Kuwait / Client: MINISTRY OF PUBLIC WORKS<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 1,133,162 in thousand US$ / Work Duration: 2010/08/01 ~ 2014/02/28</h7>
<h6>CADEREYTA COMPLEX PROJECT</h6><br><h7>Country: Mexico / Client: PETROLEOS MEXICANOS (PEMEX)<br>Company: <a href='http://www.skec.com/' target='_blank'>SK Engineering & Construction Co., Ltd.</a><br>Project Cost: 1,336,319 in thousand US$ / Work Duration: 1997/12/30 ~ 2000/06/30</h7>
<h6>COMPLETION OF BENGHAZI CENTRAL HOSPITAL PROJECT</h6><br><h7>Country: Libya / Client: SECRETARIAT OF THE GPC FOR HEALTH<br>Company: <a href='http://www.daewooenc.com/eng/' target='_blank'>Daewoo Engineering&Construction Co., Ltd.</a><br>Project Cost: 471,852 in thousand US$ / Work Duration: 1985/03/10 ~ 1996/09/28</h7>
<h6>CONST. OF MODA HEADQUARTERS BLDG.</h6><br><h7>Country: Saudi Arabia / Client: U.S ARMY CORPS OF ENGINEERS<br>Company: <a href='http://dbcon.dongbu.co.kr/english/main.jsp' target='_blank'>Dongbu Corporation.</a><br>Project Cost: 325,593 in thousand US$ / Work Duration: 1980/05/14 ~ 1986/04/15</h7>
<h6>CONSTRUCTION OF PENANG BRIDGE PACKAGES 3,4 & 5 MALAYSIA</h6><br><h7>Country: Malaysia / Client: Ministry Of Works And Public Utilities<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 250,438 in thousand US$ / Work Duration: 1982/01/01 ~ 1985/07/14</h7>
<h6>CONSTRUCTION SUPPORTS SERVICES PHASE 2 KKMC</h6><br><h7>Country: Saudi Arabia / Client: U.S ARMY CORPS OF ENGINEERS<br>Company: <a href='http://samwhan.co.kr/english.html' target='_blank'>Samwhan Corporation</a><br>Project Cost: 517,878 in thousand US$ / Work Duration: 1980/06/09 ~ 1985/06/08</h7>
<h6>CONTAINER TERMINAL PHASE II AT PASIR PANJANG S PORE - Reclamation, Soil Improvement and Decking Works</h6><br><h7>Country: Singapore / Client: Port Of Singapore Authority<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 272,853 in thousand US$ / Work Duration: 1995/10/09 ~ 2002/03/08</h7>
<h6>Capital Tower Project</h6><br><h7>Country: Singapore / Client: Pidemco Land Ltd.<br>Company: <a href='http://www.ssyenc.com/newEng/' target='_blank'>Ssangyong Engineering & Construction Co., Ltd.</a><br>Project Cost: 203,465 in thousand US$ / Work Duration: 1997/02/28 ~ 2000/06/29</h7>
<h6>Cawthorne Channel AG Gathering Project</h6><br><h7>Country: Nigeria / Client: SHELL PETROLEUM DEVELOPMENT COMPANY OF NIGERIA LIMITED<br>Company: <a href='http://www.daewooenc.com/eng/' target='_blank'>Daewoo Engineering&Construction Co., Ltd.</a><br>Project Cost: 319,000 in thousand US$ / Work Duration: 2001/04/16 ~ 2003/07/15</h7>
<h6>ChilcaUno Combined Cycle Project</h6><br><h7>Country: Peru / Client: Enersur<br>Company: <a href='http://www.poscoenc.com/eng/' target='_blank'>Posco Engineering & Construction Co., Ltd.</a><br>Project Cost: 294,579 in thousand US$ / Work Duration: 2010/06/15 ~ 2012/11/14</h7>
<h6>Chile Angamos Thermoelectric Power Plant</h6><br><h7>Country: Chile / Client: AES Gener S.A, Chile<br>Company: <a href='http://www.poscoenc.com/eng/' target='_blank'>Posco Engineering & Construction Co., Ltd.</a><br>Project Cost: 875,983 in thousand US$ / Work Duration: 2008/04/04 ~ 2011/10/02</h7>
<h6>Construction and Completion of the Superstructure Main Contract Works for the Proposed Mixed Development at KLCC</h6><br><h7>Country: Malaysia / Client: Arena Merdu Sdn. Bhd.<br>Company: <a href='http://www.daewooenc.com/eng/' target='_blank'>Daewoo Engineering&Construction Co., Ltd.</a><br>Project Cost: 206,766 in thousand US$ / Work Duration: 2009/01/16 ~ 2011/12/31</h7>
<h6>Construction of 380kV Double Circuit Overhead Transmission Line from Qassim West BSP to Madinah East</h6><br><h7>Country: Saudi Arabia / Client: Saudi Electricity Co.<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 208,094 in thousand US$ / Work Duration: 2008/04/22 ~ 2010/09/21</h7>
<h6>Construction of Ship Repair Yard and Dry-Dock Complex at Duqm Port</h6><br><h7>Country: Oman / Client: Ministry of National Economy<br>Company: <a href='http://www.daewooenc.com/eng/' target='_blank'>Daewoo Engineering&Construction Co., Ltd.</a><br>Project Cost: 289,440 in thousand US$ / Work Duration: 2008/06/08 ~ 2011/03/31</h7>
<h6>DAEWOO SHANDONG CEMENT PLANT PROJECT</h6><br><h7>Country: P.R. China / Client: DAEWOO SHANDONG CEMENT CO<br>Company: <a href='http://www.daewooenc.com/eng/' target='_blank'>Daewoo Engineering&Construction Co., Ltd.</a><br>Project Cost: 309,753 in thousand US$ / Work Duration: 1995/01/01 ~ 2001/12/30</h7>
<h6>Da Phu International New Town of Da Nang City</h6><br><h7>Country: Vietnam / Client: Daewon Cantavil Co., Ltd.<br>Company: Daewon Co., Ltd.<br>Project Cost: 250,000 in thousand US$ / Work Duration: 2008/08/28 ~ 2017/09/24</h7>
<h6>Design and Construction of East-West Transmission Cable Tunnel Contracts EW2</h6><br><h7>Country: Singapore / Client: SP Power Assets Limited (SPPA)<br>Company: <a href='http://www.skec.com/' target='_blank'>SK Engineering & Construction Co., Ltd.</a><br>Project Cost: 254,033 in thousand US$ / Work Duration: 2012/10/08 ~ 2016/12/04</h7>
<h6>Design and Construction of Infrastructure Works for the New CIty</h6><br><h7>Country: Algeria / Client: Ministry of Land Planning,Environment and Tourism<br>Company: <a href='http://eng.kne.co.kr/' target='_blank'>Keangnam Enterprises, Ltd.</a><br>Project Cost: 483,390 in thousand US$ / Work Duration: 2009/01/20 ~ 2014/09/25</h7>
<h6>Design and Construction of the Underground Caverns, Associated Underground/Aboveground Facilities and Jetty of Phase 1 Jurong Rock Cavern at Banyan Basin, Jurong Island/Singapore</h6><br><h7>Country: Singapore / Client: Jurong Town Corporation<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 651,307 in thousand US$ / Work Duration: 2009/06/15 ~ 2013/02/14</h7>
<h6>Doha North Sewerage Treatment and Associated Works(682/3)</h6><br><h7>Country: Qatar / Client: Public Works Authority<br>Company: <a href='http://www.ultracons.com/eng/intro/ceo.asp' target='_blank'>Hoban Industrial Co., Ltd.</a><br>Project Cost: 343,703 in thousand US$ / Work Duration: 2008/03/02 ~ 2011/07/27</h7>
<h6>Dow Chemical Falcon Project</h6><br><h7>Country: United States of America / Client: The Dow Chemical Company<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 411,411 in thousand US$ / Work Duration: 2011/01/11 ~ 2013/01/15</h7>
<h6>Down Town Line Contract 915</h6><br><h7>Country: Singapore / Client: Land Transport Authority<br>Company: <a href='http://www.skec.com/' target='_blank'>SK Engineering & Construction Co., Ltd.</a><br>Project Cost: 239,716 in thousand US$ / Work Duration: 2009/06/01 ~ 2016/12/20</h7>
<h6>Downtown Line Stage 2 Contract 921</h6><br><h7>Country: Singapore / Client: Land Transport Authority<br>Company: <a href='http://www.ssyenc.com/newEng/' target='_blank'>Ssangyong Engineering & Construction Co., Ltd.</a><br>Project Cost: 552,462 in thousand US$ / Work Duration: 2009/06/18 ~ 2016/03/30</h7>
<h6>Dual Feed Cracker and Associated Units of Dahej Petrochemical Complex</h6><br><h7>Country: India / Client: Oil & Natural Gas Corp.<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 951,536 in thousand US$ / Work Duration: 2008/12/23 ~ 2012/12/22</h7>
<h6>ESTABLISHMENT OF 7000 HOUSING UNITS</h6><br><h7>Country: Libya / Client: MUNICIPALITY OF BENGHAZI<br>Company: <a href='http://www.daewooenc.com/eng/' target='_blank'>Daewoo Engineering&Construction Co., Ltd.</a><br>Project Cost: 554,870 in thousand US$ / Work Duration: 1982/06/14 ~ 1990/11/13</h7>
<h6>EXPANSION OF GAS PROCESSING PLANT AND EXPORT TERMINAL</h6><br><h7>Country: Malaysia / Client: Petronas Gas Sdn..Bhd<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 359,098 in thousand US$ / Work Duration: 1990/01/06 ~ 1993/06/01</h7>
<h6>Engineering, Procurement and Construction Contract for an Ethylene Derivatives Complex at Mesaieed I</h6><br><h7>Country: Qatar / Client: Qatar Chemical Company<br>Company: <a href='http://www.daewooenc.com/eng/' target='_blank'>Daewoo Engineering&Construction Co., Ltd.</a><br>Project Cost: 420,419 in thousand US$ / Work Duration: 2005/12/01 ~ 2008/11/30</h7>
<h6>Ereection of 43-Storey Office Building at Marina View</h6><br><h7>Country: Singapore / Client: MGP Berth Pte. Ltd.<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 335,168 in thousand US$ / Work Duration: 2009/01/01 ~ 2011/06/01</h7>
<h6>Escravos Gas Plant Phase 3</h6><br><h7>Country: Nigeria / Client: CHEVRON NIGERIA LTD.<br>Company: <a href='http://english.hhi.co.kr/main/' target='_blank'>Hyundai Heavy Industries Co., Ltd.</a><br>Project Cost: 810,159 in thousand US$ / Work Duration: 2005/04/27 ~ 2008/09/30</h7>
<h6>Esmeraldas Refinery Overhauling Project</h6><br><h7>Country: Ecuador / Client: PETROINDUSTRIAL<br>Company: <a href='http://www.skec.com/' target='_blank'>SK Engineering & Construction Co., Ltd.</a><br>Project Cost: 529,926 in thousand US$ / Work Duration: 2008/12/29 ~ 2015/07/30</h7>
<h6>Ethane Separation Plant Project</h6><br><h7>Country: Thailand / Client: PTT Public Company Limited<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 472,571 in thousand US$ / Work Duration: 2007/08/06 ~ 2010/06/06</h7>
<h6>Etude et la realisation des travaux de viabilisation de la ville nouvelle de BOUGHZOUL</h6><br><h7>Country: Algeria / Client: Min. of Urban Planning & the Environment<br>Company: <a href='http://samwhan.co.kr/english.html' target='_blank'>Samwhan Corporation</a><br>Project Cost: 329,323 in thousand US$ / Work Duration: 2008/10/29 ~ 2016/06/30</h7>
<h6>FIELD ARTILLARY CENTER & SCHOOL & INFANTRY CENTER & SCHOOL, KHAMIS MUSHAYT</h6><br><h7>Country: Saudi Arabia / Client: MINISTRY OF DEFENCE & AVIATION<br>Company: <a href='http://www.hanjinsc.com/english/main.asp' target='_blank'>Hanjin Heavy Industries & Construction Co., Ltd.</a><br>Project Cost: 290,667 in thousand US$ / Work Duration: 1982/01/18 ~ 1985/05/17</h7>
<h6>Fujairah Desalination & Power Project</h6><br><h7>Country: United Arab Emirates / Client: UAE Offsets Group<br>Company: <a href='http://www.doosanheavy.com/en/main.do' target='_blank'>Doosan Heavy Industries & Construction Co., Ltd.</a><br>Project Cost: 798,204 in thousand US$ / Work Duration: 2001/06/30 ~ 2004/06/15</h7>
<h6>GAS PROJECT</h6><br><h7>Country: Saudi Arabia / Client: Saudi Aramco<br>Company: <a href='http://eng.daelim.co.kr' target='_blank'>Daelim Industrial Co., Ltd.</a><br>Project Cost: 300,000 in thousand US$ / Work Duration: 1976/10/19 ~ 1982/10/15</h7>
<h6>GODAR-E-LANDER HYDROELECTRIC POWER PROJECT LOT1-MAIN CIVIL WORKS</h6><br><h7>Country: Islamic Republic of Iran / Client: IWPRDC<br>Company: <a href='http://eng.daelim.co.kr' target='_blank'>Daelim Industrial Co., Ltd.</a><br>Project Cost: 586,276 in thousand US$ / Work Duration: 1995/01/01 ~ 1999/07/01</h7>
<h6>Gas Desulfurization Plant Project</h6><br><h7>Country: Turkmenistan / Client: Turkmen Gas<br>Company: <a href='http://eng.hec.co.kr/' target='_blank'>Hyundai Engineering Co., Ltd.</a><br>Project Cost: 1,336,113 in thousand US$ / Work Duration: 2010/01/04 ~ 2013/02/04</h7>
<h6>Gbaran/Ubie Integrated Oil & Gas Project-Main EPC contract</h6><br><h7>Country: Nigeria / Client: SHELL PETROLEUM DEVELOPMENT COMPANY OF NIGERIA LIMITED<br>Company: <a href='http://www.daewooenc.com/eng/' target='_blank'>Daewoo Engineering&Construction Co., Ltd.</a><br>Project Cost: 1,211,741 in thousand US$ / Work Duration: 2006/01/12 ~ 2011/09/28</h7>
<h6>Green Diesel Project</h6><br><h7>Country: United Arab Emirates / Client: Abu Dhabi Oil Refining Co.<br>Company: <a href='http://www.gsconst.co.kr/en/' target='_blank'>GS Engineering&Construction Corporation</a><br>Project Cost: 1,148,475 in thousand US$ / Work Duration: 2008/01/03 ~ 2016/04/18</h7>
<h6>HANG NADIM AIRPORT PROJECT PHASE-III</h6><br><h7>Country: Indonesia / Client: Sentosa Development Corp.<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 282,971 in thousand US$ / Work Duration: 1993/06/01 ~ 1996/03/30</h7>
<h6>HHIC-PHIL Subic Project Phase 1-2(2nd Batch)</h6><br><h7>Country: Philippines / Client: HHIC-PHIL<br>Company: <a href='http://www.hanjinsc.com/english/main.asp' target='_blank'>Hanjin Heavy Industries & Construction Co., Ltd.</a><br>Project Cost: 866,090 in thousand US$ / Work Duration: 2007/11/22 ~ 2010/04/30</h7>
<h6>HMC Polypropylene Project Line-3</h6><br><h7>Country: Thailand / Client: HMC Polymers Co. Ltd.<br>Company: <a href='http://www.gsconst.co.kr/en/' target='_blank'>GS Engineering&Construction Corporation</a><br>Project Cost: 200,152 in thousand US$ / Work Duration: 2007/07/09 ~ 2010/09/20</h7>
<h6>HOSPITAL HOUSING TURN KEY PROJECT JEDDAH, HOFUF, JIZZAN, MEDINA, ALKHOBAR</h6><br><h7>Country: Saudi Arabia / Client: MINISTRY OF HEALTH<br>Company: Hanyang Corporation Co., Ltd.<br>Project Cost: 415,977 in thousand US$ / Work Duration: 1979/10/08 ~ 1983/01/24</h7>
<h6>HOUSING/COMMUNITY SUPPORT & PRIMARY UTILITIES, CONSTRUCTION PACKAGE 5A/C & 3A, KAMA, RIYADH</h6><br><h7>Country: Saudi Arabia / Client: U.S ARMY CORPS OF ENGINEERS<br>Company: <a href='http://www.hanjinsc.com/english/main.asp' target='_blank'>Hanjin Heavy Industries & Construction Co., Ltd.</a><br>Project Cost: 248,326 in thousand US$ / Work Duration: 1980/06/18 ~ 1984/02/02</h7>
<h6>Hamad Medical City - Construction Package CP300B - Hospital Fit-Out</h6><br><h7>Country: Qatar / Client: Ashagal<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 1,064,475 in thousand US$ / Work Duration: 2011/02/01 ~ 2013/12/04</h7>
<h6>Hotel & Furnished Development on Plot B21 -  Superstructure Works</h6><br><h7>Country: United Arab Emirates / Client: DUBAI GOV´T-RULER COURT<br>Company: <a href='http://www.ssyenc.com/newEng/' target='_blank'>Ssangyong Engineering & Construction Co., Ltd.</a><br>Project Cost: 201,754 in thousand US$ / Work Duration: 1999/10/31 ~ 2003/02/15</h7>
<h6>IMAM MOHAMED BEN SAUD ISLAMIC UNIVERSITY ACADEMIC AREA PHASE I</h6><br><h7>Country: Saudi Arabia / Client: IMAM MOHAMMAD IBN-SAUD ISLAMIC UNIVERSITY<br>Company: Hanyang Corporation Co., Ltd.<br>Project Cost: 522,768 in thousand US$ / Work Duration: 1982/04/27 ~ 1990/12/31</h7>
<h6>IRPC UHV (Upstream Project for Hygiene and Value added Products) Project</h6><br><h7>Country: Thailand / Client: IRPC Public Company Limited<br>Company: <a href='http://www.skec.com/' target='_blank'>SK Engineering & Construction Co., Ltd.</a><br>Project Cost: 430,200 in thousand US$ / Work Duration: 2012/10/01 ~ 2015/09/01</h7>
<h6>Inter Refineries Pipeline II : Mussafah Terminal Project</h6><br><h7>Country: United Arab Emirates / Client: Abu Dhabi National Oil Company<br>Company: <a href='http://www.daewooenc.com/eng/' target='_blank'>Daewoo Engineering&Construction Co., Ltd.</a><br>Project Cost: 284,105 in thousand US$ / Work Duration: 2010/05/16 ~ 2013/12/31</h7>
<h6>Iraq Bismayah New City Project</h6><br><h7>Country: Iraq / Client: National Investment Commission (NIC)<br>Company: <a href='http://www.hwenc.com/Hceng/engMain/engmain.jsp' target='_blank'>Hanwha Engineering & Construction Corporation</a><br>Project Cost: 7,750,000 in thousand US$ / Work Duration: 2012/05/30 ~ 2019/07/31</h7>
<h6>Istanbul Strait Road Tube Crossing Project</h6><br><h7>Country: Turkey / Client: ATAS(Avrasya Tuneli Isletme Insaat ve Yatirim A.S.)<br>Company: <a href='http://www.skec.com/' target='_blank'>SK Engineering & Construction Co., Ltd.</a><br>Project Cost: 390,727 in thousand US$ / Work Duration: 2013/03/28 ~ 2017/03/31</h7>
<h6>JAMUNA MULTIPURPOSE BRIDGE PROJECT CONTRAT NO.1</h6><br><h7>Country: Bangladesh / Client: JAMUNA MULTIPURPOSE BRIDGE    AUTHORITY<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 263,483 in thousand US$ / Work Duration: 1994/04/10 ~ 1998/06/20</h7>
<h6>JG Summit NCC Project</h6><br><h7>Country: Philippines / Client: JG Summit Petrochemical Corporation<br>Company: <a href='http://eng.daelim.co.kr' target='_blank'>Daelim Industrial Co., Ltd.</a><br>Project Cost: 469,874 in thousand US$ / Work Duration: 2009/12/21 ~ 2013/07/20</h7>
<h6>Jebel Ali Power & Desalination Station M(1,330MW Power Plant Project)</h6><br><h7>Country: United Arab Emirates / Client: DUBAI ELEC. & WATER AUTHORITY<br>Company: <a href='http://www.doosanheavy.com/en/main.do' target='_blank'>Doosan Heavy Industries & Construction Co., Ltd.</a><br>Project Cost: 1,689,080 in thousand US$ / Work Duration: 2007/03/01 ~ 2012/11/15</h7>
<h6>Jurong Aromatics Complex Project</h6><br><h7>Country: Singapore / Client: Jurong Aromatics Corporation Pte. Ltd.<br>Company: <a href='http://www.skec.com/' target='_blank'>SK Engineering & Construction Co., Ltd.</a><br>Project Cost: 991,453 in thousand US$ / Work Duration: 2011/05/13 ~ 2014/05/12</h7>
<h6>KANGAN NATURAL GAS REFINERY</h6><br><h7>Country: Islamic Republic of Iran / Client: NATIONAL IRANIAN OIL CO.<br>Company: <a href='http://eng.daelim.co.kr' target='_blank'>Daelim Industrial Co., Ltd.</a><br>Project Cost: 283,582 in thousand US$ / Work Duration: 1984/04/01 ~ 1990/08/01</h7>
<h6>KANGAN NATURAL GAS REFINERY PH-2</h6><br><h7>Country: Islamic Republic of Iran / Client: NATIONAL IRANIAN OIL CO.<br>Company: <a href='http://eng.daelim.co.kr' target='_blank'>Daelim Industrial Co., Ltd.</a><br>Project Cost: 235,714 in thousand US$ / Work Duration: 1990/05/01 ~ 1995/05/01</h7>
<h6>KING ABDUL AZIZ MILITARY ACADEMY,PACKAGE 4A/B/E</h6><br><h7>Country: Saudi Arabia / Client: U.S ARMY CORPS OF ENGINEERS<br>Company: <a href='http://www.chinhung.co.kr/eng/company/5.asp' target='_blank'>Chin Hung International INC.</a><br>Project Cost: 252,863 in thousand US$ / Work Duration: 1979/07/31 ~ 1984/04/07</h7>
<h6>KIRKUK-BAIJI-HADITHA RAILWAY PROJECT</h6><br><h7>Country: Iraq / Client: NEW RAILWAYS AUTHORITY<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 728,849 in thousand US$ / Work Duration: 1982/08/23 ~ 1992/12/17</h7>
<h6>Kayan PP(Polypropylene) Project</h6><br><h7>Country: Saudi Arabia / Client: Saudi Kayan Petrochemical Company<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 365,771 in thousand US$ / Work Duration: 2007/02/01 ~ 2009/08/31</h7>
<h6>Keangnam Hanoi Landmark Tower</h6><br><h7>Country: Vietnam / Client: Keangnam VINA LLC<br>Company: <a href='http://eng.kne.co.kr/' target='_blank'>Keangnam Enterprises, Ltd.</a><br>Project Cost: 908,503 in thousand US$ / Work Duration: 2007/11/07 ~ 2011/09/19</h7>
<h6>Khalifa Port & Industrial Zone Offshore Terminal Project(CN:1000-211)</h6><br><h7>Country: United Arab Emirates / Client: Abu Dhabi Ports Co.<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 329,251 in thousand US$ / Work Duration: 2010/07/29 ~ 2012/06/29</h7>
<h6>Kia Motors Georgia Project</h6><br><h7>Country: United States of America / Client: Kia Motors America<br>Company: <a href='http://eng.hec.co.kr/' target='_blank'>Hyundai Engineering Co., Ltd.</a><br>Project Cost: 299,606 in thousand US$ / Work Duration: 2007/05/01 ~ 2009/02/20</h7>
<h6>King Abdullah Petroleum Studies and Research Center(KAPSARC) Community and Residential Complex</h6><br><h7>Country: Saudi Arabia / Client: Saudi Aramco<br>Company: <a href='http://www.skec.com/' target='_blank'>SK Engineering & Construction Co., Ltd.</a><br>Project Cost: 456,522 in thousand US$ / Work Duration: 2010/05/12 ~ 2012/06/30</h7>
<h6>LAHORE - ISLAMABAD MOTORWAY PROJECT</h6><br><h7>Country: Pakistan / Client: National Highway Authority<br>Company: <a href='http://www.daewooenc.com/eng/' target='_blank'>Daewoo Engineering&Construction Co., Ltd.</a><br>Project Cost: 1,197,693 in thousand US$ / Work Duration: 1992/04/01 ~ 1997/11/26</h7>
<h6>LAND TRANSPORTATION EXPENTION PRJ(EAST-NORTHERN)</h6><br><h7>Country: Singapore / Client: Land Transport Authority<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 223,513 in thousand US$ / Work Duration: 1997/04/26 ~ 2002/04/29</h7>
<h6>Linear Alkyl Benzene(LAB) Project</h6><br><h7>Country: Egypt / Client: Egypt Linear Alkyl Benzene<br>Company: <a href='http://www.gsconst.co.kr/en/' target='_blank'>GS Engineering&Construction Corporation</a><br>Project Cost: 222,109 in thousand US$ / Work Duration: 2006/01/01 ~ 2008/06/01</h7>
<h6>Lube Base Oil Plant Project</h6><br><h7>Country: Bahrain / Client: BAHRAIN PETROLEUM COMPANY<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 332,586 in thousand US$ / Work Duration: 2008/08/19 ~ 2011/05/30</h7>
<h6>Lukoil Iraq West Qurna-2 Field Development</h6><br><h7>Country: Iraq / Client: Lukoil Mid East<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 998,264 in thousand US$ / Work Duration: 2011/12/23 ~ 2014/07/22</h7>
<h6>MADERO REFINERY RECONFIGURATION PROJECT</h6><br><h7>Country: Mexico / Client: PETROLEOS MEXICANOS (PEMEX)<br>Company: <a href='http://www.skec.com/' target='_blank'>SK Engineering & Construction Co., Ltd.</a><br>Project Cost: 964,905 in thousand US$ / Work Duration: 1999/06/01 ~ 2002/12/01</h7>
<h6>MAKKAH-TAIF POWER STATION AND DESALINATION PLANT, LOT 1A</h6><br><h7>Country: Saudi Arabia / Client: SALINE WATER CONVERSION CORPORATION(SWCC)<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 375,205 in thousand US$ / Work Duration: 1983/10/08 ~ 1990/11/21</h7>
<h6>MALAYSIA L.N.G. PLANT PJT.</h6><br><h7>Country: Malaysia / Client: MALAYSIA LNG SDN BHD<br>Company: <a href='http://eng.daelim.co.kr' target='_blank'>Daelim Industrial Co., Ltd.</a><br>Project Cost: 326,456 in thousand US$ / Work Duration: 1979/09/28 ~ 1984/09/20</h7>
<h6>MARINA CENTRE SUPERSTRUCTURE CONTRACT.</h6><br><h7>Country: Singapore / Client: Marina Centre Holdings Pte Ltd<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 258,039 in thousand US$ / Work Duration: 1982/03/24 ~ 1986/06/30</h7>
<h6>MARJAN OFFSHORE G.O.S.P. PROJECT CONTR. NO. 27001/00</h6><br><h7>Country: Saudi Arabia / Client: Saudi Aramco<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 336,722 in thousand US$ / Work Duration: 1982/08/02 ~ 1986/04/30</h7>
<h6>METRO MANILA LRT DEVELOPMENT PJT-PKG3</h6><br><h7>Country: Philippines / Client: LIGHT RAIL TRANSIT AUTHORITY<br>Company: <a href='http://www.hanjinsc.com/english/main.asp' target='_blank'>Hanjin Heavy Industries & Construction Co., Ltd.</a><br>Project Cost: 220,395 in thousand US$ / Work Duration: 1997/10/10 ~ 2004/10/21</h7>
<h6>MISURATA POWER AND DESALINATION PLANT</h6><br><h7>Country: Libya / Client: SECRETARIAT OF THE GPC FOR HEAVY INDUSTRIES<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 529,004 in thousand US$ / Work Duration: 1983/10/30 ~ 1999/09/20</h7>
<h6>Ma aden Alumina Refinery Project</h6><br><h7>Country: Saudi Arabia / Client: Ma'aden Bauxite Alumina Company<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 1,652,366 in thousand US$ / Work Duration: 2012/03/01 ~ 2014/05/31</h7>
<h6>Ma`aden Ad`Duwayhi Gravity - CIL Gold Project</h6><br><h7>Country: Saudi Arabia / Client: Ma'aden Gold & Base Metals Co.<br>Company: <a href='http://www.hwenc.com/Hceng/engMain/engmain.jsp' target='_blank'>Hanwha Engineering & Construction Corporation</a><br>Project Cost: 278,900 in thousand US$ / Work Duration: 2013/02/19 ~ 2015/02/09</h7>
<h6>Maaden Ammonia Plant</h6><br><h7>Country: Saudi Arabia / Client: Saudi Arabian Mining Company<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 991,526 in thousand US$ / Work Duration: 2007/08/01 ~ 2010/12/27</h7>
<h6>Manifa Power Transmission and Substations</h6><br><h7>Country: Saudi Arabia / Client: Saudi Aramco<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 280,734 in thousand US$ / Work Duration: 2008/06/10 ~ 2011/06/30</h7>
<h6>Manzanillo LNG Terminal Project</h6><br><h7>Country: Mexico / Client: CFE<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 629,686 in thousand US$ / Work Duration: 2008/08/05 ~ 2011/09/01</h7>
<h6>Marafiq Construction of STG Units 5 & 6 Project</h6><br><h7>Country: Saudi Arabia / Client: Power & Water Utilities Company for Jubail & Yanbu<br>Company: <a href='http://www.hwenc.com/Hceng/engMain/engmain.jsp' target='_blank'>Hanwha Engineering & Construction Corporation</a><br>Project Cost: 818,914 in thousand US$ / Work Duration: 2009/07/27 ~ 2013/03/26</h7>
<h6>Marafiq IWPP</h6><br><h7>Country: Saudi Arabia / Client: Power & Water Utilities Company for Jubail & Yanbu<br>Company: <a href='http://english.hhi.co.kr/main/' target='_blank'>Hyundai Heavy Industries Co., Ltd.</a><br>Project Cost: 1,085,563 in thousand US$ / Work Duration: 2007/06/04 ~ 2010/03/20</h7>
<h6>Marina Bay Sands Integrated Resort Development - Package 2100 Hotel Main Contract Work</h6><br><h7>Country: Singapore / Client: Marina Bay Sands Pte Ltd<br>Company: <a href='http://www.ssyenc.com/newEng/' target='_blank'>Ssangyong Engineering & Construction Co., Ltd.</a><br>Project Cost: 756,006 in thousand US$ / Work Duration: 2008/01/04 ~ 2010/05/04</h7>
<h6>Marina Coastal Expressway Contract 482(Marina South 1)</h6><br><h7>Country: Singapore / Client: Land Transport Authority<br>Company: <a href='http://www.ssyenc.com/newEng/' target='_blank'>Ssangyong Engineering & Construction Co., Ltd.</a><br>Project Cost: 563,229 in thousand US$ / Work Duration: 2008/10/31 ~ 2014/08/14</h7>
<h6>Mong Duong 2 Thermal Power Plant</h6><br><h7>Country: Vietnam / Client: AES China<br>Company: <a href='http://www.doosanheavy.com/en/main.do' target='_blank'>Doosan Heavy Industries & Construction Co., Ltd.</a><br>Project Cost: 1,276,034 in thousand US$ / Work Duration: 2011/12/07 ~ 2015/06/07</h7>
<h6>Moscow Hotel-Business Center ph.II Project</h6><br><h7>Country: Russia / Client: ZAO LOTTE RUS<br>Company: <a href='http://www.lottecon.co.kr/eng/' target='_blank'>Lotte Engineering&Construction Co., Ltd.</a><br>Project Cost: 303,039 in thousand US$ / Work Duration: 2007/04/01 ~ 2010/05/07</h7>
<h6>NATIONAL GUARD MILITARY HOUSING PROJECT AT DIRAB</h6><br><h7>Country: Saudi Arabia / Client: NATIONAL GUARDS/DARA<br>Company: <a href='http://eng.kne.co.kr/' target='_blank'>Keangnam Enterprises, Ltd.</a><br>Project Cost: 364,843 in thousand US$ / Work Duration: 1983/08/24 ~ 1988/12/24</h7>
<h6>NCP Petrochemical Complex Project-South Plot</h6><br><h7>Country: Saudi Arabia / Client: Saudi Polymers Company<br>Company: <a href='http://eng.daelim.co.kr' target='_blank'>Daelim Industrial Co., Ltd.</a><br>Project Cost: 1,120,171 in thousand US$ / Work Duration: 2008/01/01 ~ 2011/05/11</h7>
<h6>NEW RACECOURSE AT KRANJI</h6><br><h7>Country: Singapore / Client: SINGAPORE TURF CLUB<br>Company: <a href='http://www.ssyenc.com/newEng/' target='_blank'>Ssangyong Engineering & Construction Co., Ltd.</a><br>Project Cost: 216,448 in thousand US$ / Work Duration: 1996/11/29 ~ 1999/05/31</h7>
<h6>NEW RIYADH INT AIRPORT NO.IAP-PF21 CONTROL TOWER, CEREMONIAL MALL, MOSQUE, PARKING & ARRIVAL RO</h6><br><h7>Country: Saudi Arabia / Client: MINISTRY OF DEFENCE & AVIATION<br>Company: <a href='http://www.hanjinsc.com/english/main.asp' target='_blank'>Hanjin Heavy Industries & Construction Co., Ltd.</a><br>Project Cost: 216,400 in thousand US$ / Work Duration: 1980/05/25 ~ 1994/12/31</h7>
<h6>NSRP Refinery and Petrochemical Complex Project - Marine Works</h6><br><h7>Country: Vietnam / Client: Nghi Son Refinery and Petrochemical<br>Company: <a href='http://www.skec.com/' target='_blank'>SK Engineering & Construction Co., Ltd.</a><br>Project Cost: 453,234 in thousand US$ / Work Duration: 2013/07/22 ~ 2016/07/21</h7>
<h6>Nakilat Ship Repair Yard Project</h6><br><h7>Country: Qatar / Client: Qatar Gas Transport Co.<br>Company: <a href='http://www.daewooenc.com/eng/' target='_blank'>Daewoo Engineering&Construction Co., Ltd.</a><br>Project Cost: 710,349 in thousand US$ / Work Duration: 2007/12/02 ~ 2011/07/31</h7>
<h6>National Museum of Qatar - Main Construction PKG</h6><br><h7>Country: Qatar / Client: QATAR PETROLEUM(QP)<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 562,597 in thousand US$ / Work Duration: 2011/10/30 ~ 2017/06/30</h7>
<h6>New Ethane Recovery Plant at MAA</h6><br><h7>Country: Kuwait / Client: Kuwait National Petroleum Company<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 401,235 in thousand US$ / Work Duration: 2005/06/01 ~ 2007/11/30</h7>
<h6>Nueva Ventanas Thermal Electrical Power Station</h6><br><h7>Country: Chile / Client: Empresa Electrica Ventanas S.A.<br>Company: <a href='http://www.poscoenc.com/eng/' target='_blank'>Posco Engineering & Construction Co., Ltd.</a><br>Project Cost: 377,692 in thousand US$ / Work Duration: 2006/12/01 ~ 2009/12/31</h7>
<h6>Olefins Recovery Unit and Olefins Conversion Unit of MOC Naphtha Cracker Project</h6><br><h7>Country: Thailand / Client: Map ta Phut Olefins Co., Ltd.<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 351,084 in thousand US$ / Work Duration: 2006/11/01 ~ 2009/12/31</h7>
<h6>PAITON PRIVATE POWER PROJECT PHASE I</h6><br><h7>Country: Indonesia / Client: P.T. Paiton Energy Company<br>Company: <a href='http://www.shinwha.co.kr' target='_blank'>Shin Wha Engineering & Construction Co., Ltd.</a><br>Project Cost: 379,233 in thousand US$ / Work Duration: 1995/05/18 ~ 1999/04/30</h7>
<h6>PENINSULAR GAS UTILISATION PROJECT GAS PROCESSING  PLANT TRAIN 4</h6><br><h7>Country: Malaysia / Client: Petronas Gas Sdn..Bhd<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 213,000 in thousand US$ / Work Duration: 1992/06/01 ~ 1994/09/30</h7>
<h6>PNG LNG Project</h6><br><h7>Country: Papua New Guinea / Client: Esso Highland Ltd<br>Company: <a href='http://www.daewooenc.com/eng/' target='_blank'>Daewoo Engineering&Construction Co., Ltd.</a><br>Project Cost: 421,324 in thousand US$ / Work Duration: 2011/02/08 ~ 2013/12/08</h7>
<h6>PORT FACILITIES FOR HOUSING PROGARMME ARABIAN GULF, RAS AL GHAR</h6><br><h7>Country: Saudi Arabia / Client: MINISTRY OF PUBLIC WORKS & HOUSING<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 263,418 in thousand US$ / Work Duration: 1977/03/12 ~ 1979/04/28</h7>
<h6>PORT OF JUBAIL INDUSTRIAL HARBOUR PROJECT</h6><br><h7>Country: Saudi Arabia / Client: PORT AUTHORITY<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 931,143 in thousand US$ / Work Duration: 1976/06/16 ~ 1980/12/27</h7>
<h6>PUBLIC HOUSING PROGRAMME AL-KHOBAR SITE 1,DISTRICT 1&2</h6><br><h7>Country: Saudi Arabia / Client: MINISTRY OF PUBLIC WORKS & HOUSING<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 1,113,160 in thousand US$ / Work Duration: 1978/07/15 ~ 1981/07/15</h7>
<h6>PUBLIC HOUSING PROJECT SITE 2 AT AL-KHARJ ROAD</h6><br><h7>Country: Saudi Arabia / Client: MINISTRY OF PUBLIC WORKS & HOUSING<br>Company: <a href='http://www.hanshinc.com' target='_blank'>Hanshin E&C Co.,  Ltd.</a><br>Project Cost: 315,455 in thousand US$ / Work Duration: 1978/08/12 ~ 1981/08/11</h7>
<h6>Pearl GTL Project(Feed Gas Preparation)</h6><br><h7>Country: Qatar / Client: Qatar Shell GTL Ltd.<br>Company: <a href='http://english.hhi.co.kr/main/' target='_blank'>Hyundai Heavy Industries Co., Ltd.</a><br>Project Cost: 725,783 in thousand US$ / Work Duration: 2006/08/01 ~ 2010/07/30</h7>
<h6>Pearl GTL Project(Liquids Processing Unit)</h6><br><h7>Country: Qatar / Client: Qatar Shell GTL Ltd.<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 912,115 in thousand US$ / Work Duration: 2006/08/01 ~ 2010/09/30</h7>
<h6>Petron Refinery Master Plan Phase 2 (RMP-2) Project EPC</h6><br><h7>Country: Philippines / Client: Petron Corporation<br>Company: <a href='http://eng.daelim.co.kr' target='_blank'>Daelim Industrial Co., Ltd.</a><br>Project Cost: 2,087,719 in thousand US$ / Work Duration: 2011/11/01 ~ 2014/06/30</h7>
<h6>Proposed South Beach Mixed Development Project</h6><br><h7>Country: Singapore / Client: South Beach Consortium Pte. Ltd.<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 671,788 in thousand US$ / Work Duration: 2011/08/22 ~ 2014/10/26</h7>
<h6>Qatar QAFCO Fertilizer Project Ph.5</h6><br><h7>Country: Qatar / Client: QATAR FERTILIZER CO.<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 1,167,496 in thousand US$ / Work Duration: 2007/12/14 ~ 2012/09/07</h7>
<h6>RAFFLES CITY PROJECT RC 004/007 SUPERSTRUCTURE</h6><br><h7>Country: Singapore / Client: RAFFLES CITY PTE<br>Company: <a href='http://www.ssyenc.com/newEng/' target='_blank'>Ssangyong Engineering & Construction Co., Ltd.</a><br>Project Cost: 341,190 in thousand US$ / Work Duration: 1982/12/01 ~ 1986/06/30</h7>
<h6>RAS LANUF HARBOR COMPLEX</h6><br><h7>Country: Libya / Client: RAS LANUF OIL & GAS PROCESSING CO.<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 366,602 in thousand US$ / Work Duration: 1980/09/30 ~ 1985/01/31</h7>
<h6>RIYADH DISTRICT HOSPITAL COMPLEX</h6><br><h7>Country: Saudi Arabia / Client: MINISTRY OF HEALTH<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 658,831 in thousand US$ / Work Duration: 1984/09/22 ~ 1994/06/05</h7>
<h6>RIYADH PUBLIC HOUSING PJT.</h6><br><h7>Country: Saudi Arabia / Client: MINISTRY OF PUBLIC WORKS & HOUSING<br>Company: <a href='http://eng.daelim.co.kr' target='_blank'>Daelim Industrial Co., Ltd.</a><br>Project Cost: 406,408 in thousand US$ / Work Duration: 1982/04/03 ~ 1985/07/04</h7>
<h6>RUSH HOUSING PROJECT</h6><br><h7>Country: Saudi Arabia / Client: MINISTRY OF PUBLIC WORKS & HOUSING<br>Company: Hanyang Corporation Co., Ltd.<br>Project Cost: 295,284 in thousand US$ / Work Duration: 1979/06/24 ~ 1981/06/23</h7>
<h6>Rabigh Power Plant  No.2</h6><br><h7>Country: Saudi Arabia / Client: Saudi Electricity Co.<br>Company: <a href='http://www.doosanheavy.com/en/main.do' target='_blank'>Doosan Heavy Industries & Construction Co., Ltd.</a><br>Project Cost: 3,389,990 in thousand US$ / Work Duration: 2010/09/08 ~ 2014/12/07</h7>
<h6>Ras Az Zawr Power and Desalination Phase 1(Desalination Group D)</h6><br><h7>Country: Saudi Arabia / Client: SALINE WATER CONVERSION CORPORATION(SWCC)<br>Company: <a href='http://www.doosanheavy.com/en/main.do' target='_blank'>Doosan Heavy Industries & Construction Co., Ltd.</a><br>Project Cost: 1,494,793 in thousand US$ / Work Duration: 2010/09/27 ~ 2016/03/27</h7>
<h6>Ras Laffan C IWPP Project</h6><br><h7>Country: Qatar / Client: Qatar General Electricity & Water Corp.<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 2,071,423 in thousand US$ / Work Duration: 2008/05/01 ~ 2011/04/01</h7>
<h6>Ras Laffan Refinery Project</h6><br><h7>Country: Qatar / Client: Qatar Petroleum&(France)Total& (US)ExxonMobil Corporation<br>Company: <a href='http://www.gsconst.co.kr/en/' target='_blank'>GS Engineering&Construction Corporation</a><br>Project Cost: 437,354 in thousand US$ / Work Duration: 2005/06/20 ~ 2010/01/31</h7>
<h6>Reconstruction Project of MAA Refinery</h6><br><h7>Country: Kuwait / Client: Kuwait National Petroleum Company<br>Company: <a href='http://www.skec.com/' target='_blank'>SK Engineering & Construction Co., Ltd.</a><br>Project Cost: 286,064 in thousand US$ / Work Duration: 2001/02/12 ~ 2003/10/12</h7>
<h6>Rehabilitation & Adaptation of  Arzew Refinery Project</h6><br><h7>Country: Algeria / Client: NAFTEC<br>Company: <a href='http://www.hwenc.com/Hceng/engMain/engmain.jsp' target='_blank'>Hanwha Engineering & Construction Corporation</a><br>Project Cost: 201,440 in thousand US$ / Work Duration: 2009/04/12 ~ 2012/12/31</h7>
<h6>Rehabilitation and Adaptation of Skikda Refinery</h6><br><h7>Country: Algeria / Client: SONATRACH<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 2,589,731 in thousand US$ / Work Duration: 2009/09/01 ~ 2012/08/31</h7>
<h6>Rumaila Gas Turbine Power Plant Project</h6><br><h7>Country: Iraq / Client: Ministry of Electricity<br>Company: <a href='http://eng.hec.co.kr/' target='_blank'>Hyundai Engineering Co., Ltd.</a><br>Project Cost: 308,064 in thousand US$ / Work Duration: 2011/11/22 ~ 2013/10/12</h7>
<h6>Ruwais Refinery Expansion Project PKG 1</h6><br><h7>Country: United Arab Emirates / Client: Abu Dhabi Oil Refining Co.<br>Company: <a href='http://www.skec.com/' target='_blank'>SK Engineering & Construction Co., Ltd.</a><br>Project Cost: 2,304,841 in thousand US$ / Work Duration: 2009/11/14 ~ 2014/02/13</h7>
<h6>SAMCo Acrylic Acid Complex</h6><br><h7>Country: Saudi Arabia / Client: Saudi Acrylic Acid Co., Saudi Acrylic Monomer Co.<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 706,762 in thousand US$ / Work Duration: 2010/10/01 ~ 2013/12/02</h7>
<h6>SAUDI NAVAL EXPANSION PROGRAMME OFFSHORE FACILITIES, JUBAIL</h6><br><h7>Country: Saudi Arabia / Client: U.S ARMY CORPS OF ENGINEERS<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 205,820 in thousand US$ / Work Duration: 1975/12/01 ~ 1978/12/18</h7>
<h6>SELETAR SEWGE TREATMENT WORKS PHASE III EXTENSION-MAIN CIVIL WORKS</h6><br><h7>Country: Singapore / Client: Ministry of Environment<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 238,314 in thousand US$ / Work Duration: 1995/07/10 ~ 1998/07/08</h7>
<h6>SHARQ EG Project</h6><br><h7>Country: Saudi Arabia / Client: EASTERN PETROCHEMICAL CO<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 405,814 in thousand US$ / Work Duration: 2005/09/15 ~ 2009/08/10</h7>
<h6>SULB Heavy Section Mill Project</h6><br><h7>Country: Bahrain / Client: United Steel Company<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 328,103 in thousand US$ / Work Duration: 2010/03/30 ~ 2012/12/24</h7>
<h6>SUNTEC CITY PACKAGE 3B WORKS</h6><br><h7>Country: Singapore / Client: Suntec City Development Pte Ltd<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 509,450 in thousand US$ / Work Duration: 1992/04/01 ~ 1994/12/31</h7>
<h6>Sabah Oil & Gas Terminal Project</h6><br><h7>Country: Malaysia / Client: Petronas Carigali Sdn..Bhd.<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 823,599 in thousand US$ / Work Duration: 2010/08/27 ~ 2014/05/31</h7>
<h6>Sabiya CCGT Power Plant</h6><br><h7>Country: Kuwait / Client: MINISTRY OF ELECTRICITY AND WATER<br>Company: <a href='http://english.hhi.co.kr/main/' target='_blank'>Hyundai Heavy Industries Co., Ltd.</a><br>Project Cost: 1,379,302 in thousand US$ / Work Duration: 2009/09/13 ~ 2012/06/01</h7>
<h6>Salalah Methanol Plante Prokecct</h6><br><h7>Country: Oman / Client: Salalah Methanol Company L.L.C<br>Company: <a href='http://www.gsconst.co.kr/en/' target='_blank'>GS Engineering&Construction Corporation</a><br>Project Cost: 723,325 in thousand US$ / Work Duration: 2007/04/01 ~ 2010/05/16</h7>
<h6>Saudi Aramco Third Party Co-Generation Program</h6><br><h7>Country: Saudi Arabia / Client: Tihama Power Generation Co., Ltd<br>Company: <a href='http://english.hhi.co.kr/main/' target='_blank'>Hyundai Heavy Industries Co., Ltd.</a><br>Project Cost: 427,827 in thousand US$ / Work Duration: 2004/02/26 ~ 2006/12/01</h7>
<h6>Saudi Kayan Petrochemical Complex Project- Polycarbonates Facilities</h6><br><h7>Country: Saudi Arabia / Client: Saudi Kayan Petrochemical Company<br>Company: <a href='http://eng.daelim.co.kr' target='_blank'>Daelim Industrial Co., Ltd.</a><br>Project Cost: 1,347,295 in thousand US$ / Work Duration: 2007/02/22 ~ 2010/04/22</h7>
<h6>Sewage Treatment Plant and Sewer Conveyance system at Muharraq</h6><br><h7>Country: Bahrain / Client: Muharraq STP Company B.S.C.<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 250,200 in thousand US$ / Work Duration: 2011/02/02 ~ 2014/08/01</h7>
<h6>Shah Gas Development PKG-4(Utility&Off-Site)</h6><br><h7>Country: United Arab Emirates / Client: ADNOC+ConocoPhillips<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 1,541,764 in thousand US$ / Work Duration: 2010/05/06 ~ 2014/09/05</h7>
<h6>Sheikh Jaber Al Ahmed Al Sabah Causeway(Subiya Link)</h6><br><h7>Country: Kuwait / Client: MINISTRY OF PUBLIC WORKS<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 2,055,103 in thousand US$ / Work Duration: 2012/11/14 ~ 2017/11/14</h7>
<h6>Shoaiba Phase 3 Independent Water & Power Project</h6><br><h7>Country: Saudi Arabia / Client: Water&Electrrcity L.L.C (WEC)<br>Company: <a href='http://www.doosanheavy.com/en/main.do' target='_blank'>Doosan Heavy Industries & Construction Co., Ltd.</a><br>Project Cost: 850,051 in thousand US$ / Work Duration: 2006/01/15 ~ 2010/01/14</h7>
<h6>Shuaiba North Co-Generation (Power&Distillation) Plant</h6><br><h7>Country: Kuwait / Client: MINISTRY OF ELECTRICITY AND WATER<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 713,559 in thousand US$ / Work Duration: 2007/06/26 ~ 2010/05/26</h7>
<h6>Sohar 2 IPP Project</h6><br><h7>Country: Oman / Client: Al Batinah Co. SAOC<br>Company: <a href='http://www.gsconst.co.kr/en/' target='_blank'>GS Engineering&Construction Corporation</a><br>Project Cost: 289,413 in thousand US$ / Work Duration: 2010/09/24 ~ 2013/04/01</h7>
<h6>Sohar Aromatics Project</h6><br><h7>Country: Oman / Client: Aromatics Oman LLC<br>Company: <a href='http://www.gsconst.co.kr/en/' target='_blank'>GS Engineering&Construction Corporation</a><br>Project Cost: 1,260,109 in thousand US$ / Work Duration: 2006/07/11 ~ 2010/02/07</h7>
<h6>South Pars Phase 4-5</h6><br><h7>Country: Islamic Republic of Iran / Client: Agip Iran BV<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 1,623,339 in thousand US$ / Work Duration: 2002/03/01 ~ 2005/02/28</h7>
<h6>Sur Independent Power Project</h6><br><h7>Country: Oman / Client: Phoenix Power Company SAOC<br>Company: <a href='http://www.daewooenc.com/eng/' target='_blank'>Daewoo Engineering&Construction Co., Ltd.</a><br>Project Cost: 1,257,786 in thousand US$ / Work Duration: 2011/07/13 ~ 2014/04/01</h7>
<h6>TAN TOCK HOSPITAL REDEVELOPMENT PROJECT</h6><br><h7>Country: Singapore / Client: Ministry of Health<br>Company: <a href='http://www.ssyenc.com/newEng/' target='_blank'>Ssangyong Engineering & Construction Co., Ltd.</a><br>Project Cost: 250,225 in thousand US$ / Work Duration: 1995/04/19 ~ 1998/11/08</h7>
<h6>TELECOM MALAYSIA HEADGUARTER MAIN BUILDING WORKS(PKG A)</h6><br><h7>Country: Malaysia / Client: Telecom Malaysia Bhd.<br>Company: <a href='http://www.daewooenc.com/eng/' target='_blank'>Daewoo Engineering&Construction Co., Ltd.</a><br>Project Cost: 238,489 in thousand US$ / Work Duration: 1995/11/01 ~ 1998/04/01</h7>
<h6>TELEPHONE EXPANSION PROJECT PART 1,2 & 3 OVERALL SITES IN SAUDI ARABIA</h6><br><h7>Country: Saudi Arabia / Client: MINISTRY OF POST,TELECOMMUNICATION & TELEPHONES<br>Company: <a href='http://www.dongah.co.kr' target='_blank'>Dong Ah Construction Ind Co., Ltd.</a><br>Project Cost: 1,245,511 in thousand US$ / Work Duration: 1978/02/07 ~ 1985/06/30</h7>
<h6>THE GREAT MAN-MADE RIVER PROJ.</h6><br><h7>Country: Libya / Client: THE MANAGEMENT & IMPLEMENTATION AUTHORITY OF GMR P<br>Company: <a href='http://www.dongah.co.kr' target='_blank'>Dong Ah Construction Ind Co., Ltd.</a><br>Project Cost: 3,752,448 in thousand US$ / Work Duration: 1984/01/16 ~ 1998/02/28</h7>
<h6>THE MANAGEMENT & IMPLEMENTATION AUTHORITY OF THE GREAT MAN-MADE RIVER PROJECT</h6><br><h7>Country: Libya / Client: THE MANAGEMENT & IMPLEMENTATION AUTHORITY OF GMR P<br>Company: <a href='http://www.dongah.co.kr' target='_blank'>Dong Ah Construction Ind Co., Ltd.</a><br>Project Cost: 6,458,520 in thousand US$ / Work Duration: 1990/06/25 ~ 2003/12/31</h7>
<h6>Tasnee Ethylene Project</h6><br><h7>Country: Saudi Arabia / Client: TASNEE Petrochemical Co.<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 899,551 in thousand US$ / Work Duration: 2005/11/13 ~ 2008/11/22</h7>
<h6>Tufanbeyli Thermal Power Plant Project</h6><br><h7>Country: Turkey / Client: Enerjisa<br>Company: <a href='http://www.skec.com/' target='_blank'>SK Engineering & Construction Co., Ltd.</a><br>Project Cost: 616,225 in thousand US$ / Work Duration: 2011/03/18 ~ 2015/02/18</h7>
<h6>U-Bora Tower Project</h6><br><h7>Country: United Arab Emirates / Client: Bando Const.<br>Company: Bando Corporation Co., Ltd.<br>Project Cost: 382,287 in thousand US$ / Work Duration: 2007/08/16 ~ 2011/01/20</h7>
<h6>Ultra Mega Power Project at Mundra</h6><br><h7>Country: India / Client: Coastal Gujarat Power Ltd<br>Company: <a href='http://www.doosanheavy.com/en/main.do' target='_blank'>Doosan Heavy Industries & Construction Co., Ltd.</a><br>Project Cost: 1,235,000 in thousand US$ / Work Duration: 2007/09/01 ~ 2013/03/22</h7>
<h6>Umm Shaif Gas Injection Facilities Project</h6><br><h7>Country: United Arab Emirates / Client: Abu Dhabi Marine Operarion Company<br>Company: <a href='http://english.hhi.co.kr/main/' target='_blank'>Hyundai Heavy Industries Co., Ltd.</a><br>Project Cost: 1,691,685 in thousand US$ / Work Duration: 2006/09/24 ~ 2010/06/15</h7>
<h6>Upgrading of Obsolete Fire Detection, Alarm and Suppression System at KNPC Sites</h6><br><h7>Country: Kuwait / Client: Kuwait National Petroleum Company<br>Company: <a href='http://www.hwenc.com/Hceng/engMain/engmain.jsp' target='_blank'>Hanwha Engineering & Construction Corporation</a><br>Project Cost: 223,639 in thousand US$ / Work Duration: 2011/05/01 ~ 2014/06/30</h7>
<h6>Wasit Gas Program PKG 2- Cogeneration and Steam Generation Project</h6><br><h7>Country: Saudi Arabia / Client: Saudi Aramco<br>Company: <a href='http://www.samsungengineering.com/' target='_blank'>Samsung Engineering Co., Ltd.</a><br>Project Cost: 645,909 in thousand US$ / Work Duration: 2011/08/10 ~ 2014/03/31</h7>
<h6>YANBU OIL PORT AND DEBALLAST FACILITIES(CONTRACT NO.PIC D-1302)</h6><br><h7>Country: Saudi Arabia / Client: ROYAL COMMISSION FOR JUBAIL & YANBU<br>Company: <a href='http://en.hdec.kr' target='_blank'>Hyundai Engineering&Construction Co., Ltd.</a><br>Project Cost: 278,511 in thousand US$ / Work Duration: 1982/02/25 ~ 1985/01/31</h7>
<h6>Yabbu Export Refinery Project Crude PKG(EPC-2)</h6><br><h7>Country: Saudi Arabia / Client: Saudi Aramco<br>Company: <a href='http://www.skec.com/' target='_blank'>SK Engineering & Construction Co., Ltd.</a><br>Project Cost: 664,843 in thousand US$ / Work Duration: 2010/08/01 ~ 2014/12/31</h7>
<h6>Yanbu 2 Power & Water Project PKG 1</h6><br><h7>Country: Saudi Arabia / Client: Power & Water Utilities Company for Jubail & Yanbu<br>Company: <a href='http://www.hwenc.com/Hceng/engMain/engmain.jsp' target='_blank'>Hanwha Engineering & Construction Corporation</a><br>Project Cost: 1,075,171 in thousand US$ / Work Duration: 2011/02/26 ~ 2014/02/25</h7>
<h6>Yerevan Combined Cycle Cogeneration Power Plant Project</h6><br><h7>Country: Armenia / Client: Yerevan Thermal Power Plant CJSC<br>Company: <a href='http://www.gsconst.co.kr/en/' target='_blank'>GS Engineering&Construction Corporation</a><br>Project Cost: 214,058 in thousand US$ / Work Duration: 2008/01/09 ~ 2010/10/20</h7>